1 00:00:04,670 --> 00:00:01,370 [Music] 2 00:00:08,810 --> 00:00:04,680 this video is for the Isis rollout Solar 3 00:00:11,810 --> 00:00:08,820 Ray or irosa 1A install Eva Steve Bowen 4 00:00:13,669 --> 00:00:11,820 ev1 with the red stripes egresses and 5 00:00:15,650 --> 00:00:13,679 receives a crew lock bag and puts it on 6 00:00:18,189 --> 00:00:15,660 his body restraint tether 7 00:00:20,570 --> 00:00:18,199 ev2 with white stripes Woody hoberg 8 00:00:22,550 --> 00:00:20,580 egresses with acrylic bag on his body 9 00:00:24,230 --> 00:00:22,560 restraint tether and closes the thermal 10 00:00:26,630 --> 00:00:24,240 cover 11 00:00:29,089 --> 00:00:26,640 ev1 translates up the forward face of 12 00:00:31,189 --> 00:00:29,099 the truss and goes starboard he stops to 13 00:00:33,770 --> 00:00:31,199 configure safety to others 14 00:00:35,990 --> 00:00:33,780 ev2 follows a similar translation path 15 00:00:38,030 --> 00:00:36,000 and goes to the port crew equipment 16 00:00:40,310 --> 00:00:38,040 translation Aid card to temporarily 17 00:00:43,490 --> 00:00:40,320 stose bag and retrieve an articulating 18 00:00:46,130 --> 00:00:43,500 portable foot restraint meanwhile ev1 19 00:00:48,650 --> 00:00:46,140 translates to the irosa carrier stows 20 00:00:49,729 --> 00:00:48,660 his bag and retrieves his pistol grip 21 00:00:52,549 --> 00:00:49,739 tool 22 00:00:54,529 --> 00:00:52,559 ev1 begins preparing irosa for removal 23 00:00:57,229 --> 00:00:54,539 from the carrier first releasing a 24 00:01:00,590 --> 00:00:57,239 restraint bolt on the upper eye Rosa 25 00:01:02,209 --> 00:01:00,600 ev2 relocates the foot restraint and 26 00:01:03,650 --> 00:01:02,219 installs it on the Space Station's 27 00:01:06,830 --> 00:01:03,660 robotic arm 28 00:01:08,690 --> 00:01:06,840 ev2 ingresses the foot restraint and 29 00:01:10,670 --> 00:01:08,700 then the arm will move them away from 30 00:01:13,370 --> 00:01:10,680 the Truss 31 00:01:15,710 --> 00:01:13,380 ev1 translates to the lower Rosa and 32 00:01:18,710 --> 00:01:15,720 releases its first restraint bulb he 33 00:01:20,990 --> 00:01:18,720 releases both anti-rotation devices back 34 00:01:22,860 --> 00:01:21,000 on the upper eye Rosa and then we'll 35 00:01:30,710 --> 00:01:22,870 Stow them in the crew lock bag 36 00:01:34,609 --> 00:01:30,720 [Music] 37 00:01:37,490 --> 00:01:34,619 on the robotic arm ev2 is flown over to 38 00:01:40,069 --> 00:01:37,500 access two sets of bolts on the boom end 39 00:01:42,590 --> 00:01:40,079 of the upper irosa 40 00:01:44,990 --> 00:01:42,600 the first two bolts will allow the boom 41 00:01:46,670 --> 00:01:45,000 deployment system rollers to be moved 42 00:01:51,490 --> 00:01:46,680 into place to help with the array 43 00:01:57,230 --> 00:01:54,830 the second two bolts will release two of 44 00:01:59,450 --> 00:01:57,240 four mechanisms that hold the Arosa in 45 00:02:01,910 --> 00:01:59,460 its rolled up configuration 46 00:02:04,490 --> 00:02:01,920 ev1 partially releases the upper eye 47 00:02:06,770 --> 00:02:04,500 roses restraint fold and installs the 48 00:02:09,290 --> 00:02:06,780 first of two handling AIDS called scoops 49 00:02:10,669 --> 00:02:09,300 and prep for removing a Rosa from the 50 00:02:13,369 --> 00:02:10,679 carrier 51 00:02:15,770 --> 00:02:13,379 the arm flies ev2 over to the hinge end 52 00:02:17,690 --> 00:02:15,780 of the upper eye Rosa and both crew 53 00:02:20,630 --> 00:02:17,700 members work to release the final bolt 54 00:02:23,390 --> 00:02:20,640 holding it to the carrier eb1 installs a 55 00:02:27,600 --> 00:02:23,400 second scoop an ev2 lifts the eye Rosa 56 00:02:27,610 --> 00:02:33,250 [Music] 57 00:02:39,350 --> 00:02:36,170 after several Maneuvers on the robotic 58 00:02:42,229 --> 00:02:39,360 arm ev2 will arrive at the 1A mod kit 59 00:02:44,270 --> 00:02:42,239 work site during these Maneuvers ev1 60 00:02:46,729 --> 00:02:44,280 will pick up the temporarily stowed bag 61 00:02:49,309 --> 00:02:46,739 from the port cart and reconfigure both 62 00:02:51,990 --> 00:02:49,319 Cruise safety toddlers on his way to 63 00:02:57,850 --> 00:02:52,000 meet ev2 at the mod kit 64 00:03:00,290 --> 00:02:57,860 [Music] 65 00:03:06,380 --> 00:03:00,300 both crew will then work to install 66 00:03:12,649 --> 00:03:09,430 [Music] 67 00:03:14,570 --> 00:03:12,659 the crew will release the scoops and ev2 68 00:03:16,790 --> 00:03:14,580 will move into position to release the 69 00:03:17,890 --> 00:03:16,800 final bolt holding iroza in its folded 70 00:03:20,809 --> 00:03:17,900 position 71 00:03:23,030 --> 00:03:20,819 once released ev1 will hold our Rosa 72 00:03:26,030 --> 00:03:23,040 closed while ev2 egresses his foot 73 00:03:27,890 --> 00:03:26,040 restraint and gets into position 74 00:03:29,930 --> 00:03:27,900 both crew will then work together to 75 00:03:32,210 --> 00:03:29,940 unfold iroza and secure the right side 76 00:03:35,630 --> 00:03:32,220 onto the mounting bracket 77 00:03:37,550 --> 00:03:35,640 once secured ev2 will drive two hinge 78 00:03:39,110 --> 00:03:37,560 bolts that hold iroza in the unfolded 79 00:03:42,170 --> 00:03:39,120 position 80 00:03:44,449 --> 00:03:42,180 ev2 will then move away from my Rosa to 81 00:03:47,509 --> 00:03:44,459 reconfigure her safety tether on the arm 82 00:03:54,190 --> 00:03:47,519 ev1 Works to drive 8 bolts to fully 83 00:03:59,330 --> 00:03:57,229 both crew will then work to electrically 84 00:04:01,970 --> 00:03:59,340 connect the new iroza to the ISS power 85 00:04:04,670 --> 00:04:01,980 system they'll first attach four 86 00:04:07,009 --> 00:04:04,680 connectors to a Rosa then both will move 87 00:04:09,350 --> 00:04:07,019 to either side of the Legacy array to 88 00:04:11,449 --> 00:04:09,360 disconnect the old array and connect a 89 00:04:13,670 --> 00:04:11,459 white cable this will allow power to 90 00:04:15,830 --> 00:04:13,680 flow from both the new irosa and the 91 00:04:16,259 --> 00:04:15,840 Legacy array to the space station power 92 00:04:24,249 --> 00:04:16,269 system 93 00:04:29,450 --> 00:04:27,110 at this point ev1 moves into a 94 00:04:31,490 --> 00:04:29,460 deployment viewing position and ev2 will 95 00:04:33,790 --> 00:04:31,500 release the final two bolts restraining 96 00:04:36,710 --> 00:04:33,800 irosa in the undeployed position 97 00:04:37,850 --> 00:04:36,720 iroza will deploy over the next 6 to 10 98 00:04:40,969 --> 00:04:37,860 minutes 99 00:04:43,249 --> 00:04:40,979 during deployment ev1 translates back to 100 00:04:44,990 --> 00:04:43,259 diversa carrier to reconfigure the 101 00:04:45,990 --> 00:04:45,000 carrier beams that previously held the 102 00:04:47,450 --> 00:04:46,000 upper irosa 103 00:04:49,730 --> 00:04:47,460 [Music] 104 00:04:52,010 --> 00:04:49,740 these beams need to be rotated out of 105 00:04:56,390 --> 00:04:52,020 the way to allow access to the lower 106 00:05:01,129 --> 00:04:59,270 once deployment is complete ev2 will 107 00:05:03,530 --> 00:05:01,139 release two bolts that allow the erosa 108 00:05:06,370 --> 00:05:03,540 blankets to become tensioned 109 00:05:09,409 --> 00:05:06,380 ev2 then cleans up the mod kit worksite 110 00:05:11,450 --> 00:05:09,419 retrieving his crew lock bag and head to 111 00:05:15,530 --> 00:05:11,460 the carrier to help ev1 with the carrier 112 00:05:19,070 --> 00:05:17,330 the crew members work together to 113 00:05:19,790 --> 00:05:19,080 release the bolts holding the beams in 114 00:05:21,770 --> 00:05:19,800 place 115 00:05:25,610 --> 00:05:21,780 then they will rotate the beams out of 116 00:05:28,550 --> 00:05:25,620 the way and secure them back down 117 00:05:36,129 --> 00:05:28,560 this is the last task in the first Eva 118 00:05:41,450 --> 00:05:38,570 both crew will clean up the work site 119 00:05:44,150 --> 00:05:41,460 and translate back to the airlock they 120 00:05:46,850 --> 00:05:44,160 will clean up their tethers on the way 121 00:05:49,850 --> 00:05:46,860 they will then work to Ingress and begin 122 00:05:55,030 --> 00:05:49,860 repressing the airlock this will finish 123 00:05:55,040 --> 00:06:00,850 [Music]